Material Request

A Material Request is an internal request for items โ€” for purchase, manufacture, or transfer between warehouses. It's the first step in the procurement or production process.

When to Use Material Requests

  • Stock levels fall below reorder point (auto-generated)
  • A department needs materials for a project
  • Manufacturing needs raw materials for a production run
  • A branch requests stock transfer from the main warehouse
  • Service/maintenance team needs spare parts

Creating a Material Request

  1. Go to Stock > Material Request and click New.
  2. Select the Purpose:

- Purchase: Items need to be bought

- Manufacture: Items need to be produced

- Material Transfer: Items need to be moved between warehouses

- Customer Provided: Customer-provided materials needed

  1. Set the Required Date.
  2. Add items in the Items table:

- Item Code, Quantity, Warehouse

  1. Click Save and Submit.

Material Request Workflow

Material Request โ†’ Purchase Order (if purpose is Purchase)
                  โ†’ Work Order (if purpose is Manufacture)
                  โ†’ Stock Entry (if purpose is Material Transfer)

Auto-Generated Material Requests

YousrERP can automatically create Material Requests when:

  • Reorder Level is reached (based on item reorder settings)
  • Sales Order items are not in stock
  • Production Plan requires raw materials
  • Project requires materials

Material Request Status

Status Description
Draft Being prepared
Submitted Approved, awaiting action
Stopped Request paused
Partially Ordered/Transferred Some items ordered and some not
Ordered/Transferred/Manufactured All items processed
Cancelled Request cancelled

Converting to Purchase Order

  1. Open the submitted Material Request (with Purpose: Purchase).
  2. Click Create > Purchase Order.
  3. A Purchase Order is created with the requested items.